R.E Boats Photo Gallery

Repairs, Modifications, Designs, Modules
Home > Completed Work > Pelin Empress 24

empress_helm_seat.JPG
561 viewsNew helm seat hinges forward to reveal the gulley sink.44444
(1 votes)
cabintop_windows_glued_in.jpg
473 views00000
(0 votes)
Crompo_portside_bow_on.JPG
524 viewsNew Cabintop after replacing the rotten Cabin sides. Restyled.11111
(1 votes)
A_before_alts_started.JPG
510 views24 foot pelin in its original shape.00000
(0 votes)
Empress_motor_removed.jpg
514 views00000
(0 votes)
foam_between_stringers.jpg
582 viewsHull extended 600mm and foam filled between stringers for added strength and to eliminate water traps.00000
(0 votes)
Hull_antifouled.JPG
450 viewsHull with new Anti foul and awaiting the motor to be reattached, showing the Portfino stern which increases to standing area aft.00000
(0 votes)
Interior_removed.jpg
597 viewsOriginal interior removed ready to start the upgrades.00000
(0 votes)
new_transom_in_place.jpg
467 views00000
(0 votes)
portifino_glued_on.JPG
476 viewsHull modifications completed ready for fibreglassing.00000
(0 votes)
side_lockers_nearing_completion.JPG
752 viewsOpen cockpit lockers prepainted. Set up for rod racks etc.00000
(0 votes)
Stb_step_through.JPG
410 viewsAft step through lockers. The fuel filters and oil reservior will be housed in these areas, also doubles to prevent waves entering the cockpit easily and a seat each side of the gas- Bbq locker.00000
(0 votes)
43 files on 4 page(s) 1