R.E Boats Photo Gallery

Repairs, Modifications, Designs, Modules
Home > Boat Builder > Matakohe > R E 1020 launch

Chines_and_Gunwhales_on_stb_bow.JPG
RE 1020 launch115 viewsFrames set up with Chines and Gunwhales in place ready start applying the planks00000
(0 votes)
Fairing_2.JPG
RE 1020 95 viewsTopsides faired with rebates in for the fiberglass laps 00000
(0 votes)
Filled_topsides_ready_to_glass.JPG
RE 1020 launch93 viewsTopsides planked and filled ready to fiberglass00000
(0 votes)
Glassing_Topsidee_4.JPG
RE 1020 launch88 viewsTopsides fiberglassed00000
(0 votes)
Glassing_topsides_1.JPG
RE 1020 launch96 viewsLaying out of the cloth full length of the topsides00000
(0 votes)
Glassing_topsides_5.JPG
RE 1020 launch96 viewsTopside glassed00000
(0 votes)
Setting_up_aft_frames.JPG
RE 1020 launch80 viewsStarting to set up the temporary frames00000
(0 votes)
Setup_frames_and_stem.JPG
RE 1020 launch84 viewsStem in place00000
(0 votes)
Temp_frame_being_built_1.JPG
RE 1020 launch80 viewsTemporary frame under construction00000
(0 votes)
Temp_frame_built_4.JPG
RE 1020 Launch82 viewsTemporary Frame on loft table00000
(0 votes)
Bottom_planked_28129.JPG
61 views00000
(0 votes)
Cabintop_upper_28129.JPG
63 views00000
(0 votes)
32 files on 3 page(s) 1