R.E Boats Photo Gallery

Repairs, Modifications, Designs, Modules
Home > Completed Work > Townson 25

T25_hull_repair.JPG
422 viewsHUll repair. Layers staggered and scarfed ready for new stringers and new skin to be attached.22222
(2 votes)
Cabin_filled.JPG
196 viewsNew ply- foam -glass cabintop molded from the original but self supporting and increases the headroom by 50mm. This was done to replace the existing one which was rotten.00000
(0 votes)
Cabin_top_sited.jpg
306 viewsHull stripped right back waiting to be fiberglassed.55555
(2 votes)
decks_and_coamings_glued_on.JPG
222 viewsNew main bulkhead, sidedecks and cabinside glued in place.00000
(0 votes)
Forward_bulkhead_stringer.JPG
219 viewsInterior stripped clean ready for Epoxy sealer to be applied.00000
(0 votes)
Hull_repair.JPG
211 viewsHull patch, showing double diagonal planking.00000
(0 votes)
Main_bulkhead.JPG
194 viewsMain bulkhead glued in. Hull repaired and new stringers scarfed into place.44444
(1 votes)
Mast_bulkhead_removed.JPG
193 viewsMast bulkhead removed.00000
(0 votes)
New_planking.JPG
165 viewsDouble diagonal hull patch.00000
(0 votes)
New_stringers.JPG
184 viewsNew stringers fitted.00000
(0 votes)
port_coaming_glued_on.JPG
215 viewsHull proped up until the bulkhead is glued in position.00000
(0 votes)
Repairs_to_foredeck_stringers_and_beam.JPG
3330 viewsDeckbeam scarfed.00000
(0 votes)
35 files on 3 page(s) 1